📢 Gate Square #Creator Campaign Phase 2# is officially live!
Join the ZKWASM event series, share your insights, and win a share of 4,000 $ZKWASM!
As a pioneer in zk-based public chains, ZKWASM is now being prominently promoted on the Gate platform!
Three major campaigns are launching simultaneously: Launchpool subscription, CandyDrop airdrop, and Alpha exclusive trading — don’t miss out!
🎨 Campaign 1: Post on Gate Square and win content rewards
📅 Time: July 25, 22:00 – July 29, 22:00 (UTC+8)
📌 How to participate:
Post original content (at least 100 words) on Gate Square related to
China Molybdenum: TFM Mixed Mine achieved the goal of "double standard" as scheduled
Luoyang Molybdenum Industry News: As of June 30th, the average monthly production of cathode copper in the TFM mixed ore east area exceeded 18,000 tons for three consecutive months, reaching 105% of the production target. The average monthly production of cobalt hydroxide exceeded 900 tons, reaching 100% of the production target. At the same time, the quality of cathode copper products reached 99% HG+ST, and the cobalt content of cobalt hydroxide reached above 37%. The planned production volume and quality of the products have both met the standards, which means that the eastern area of the mixed ore has the production capacity of 200,000 tons of copper and 12,000 tons of cobalt per year.